There is currently no limit to the number of plans that can be created for a single drawing.
When a new Drawing / Part Number is created, Plan 1 is automatically generated.
The active plan number can be viewed:
Each plan should have a meaningful description explaining its purpose.
For example:
| Plan No. | Description |
|---|---|
| 1 | 316 Stainless |
| 2 | Mild Steel |
| 3 | Customer Material |
Plan descriptions are entered within the:
tabs, immediately above the entry grid.
Use the same description for the same Plan Number across all four sections.
This makes it easy to identify if an incorrect plan has been selected.
For example:
| Plan No. | Process | Material | Subcontract |
|---|---|---|---|
| 2 | Aluminium | Aluminium | Aluminium |
Maintaining consistency reduces the risk of estimating machining times for one material while using another.
Open any of the following tabs:
Enter a new Plan Number in the Plan Number field above the grid.
Enter a Plan Description.
Enter the required information into the grid.
Alternatively, use Copy Plan to duplicate an existing plan and then modify it.
The new plan will contain the same information as the original and can then be edited as required.
Each tab also contains a Copy button.
This allows plans to be copied from another Drawing / Part Number.
For example, if:
BS1768 1/4 X 6
contains a suitable plan structure, you can copy:
from that drawing into the drawing you are currently editing.
Each section can be copied from a different drawing if required.
When moving between tabs, the displayed Plan Number automatically resets to Plan 1.
This behaviour is controlled by the plan settings held on the main:
screen.
To change the active plan:
For simplicity, it is recommended that all plan types use the same Plan Number.
Important: If an existing Drawing / Part Number already has plans, any changes made to Process, Material, Subcontract, or Miscellaneous information will affect all records using that plan.
Unless you are correcting an error, always create a new plan when manufacturing requirements change, such as:
- Different materials
- Different subcontract finishes
- Alternative manufacturing methods
Customer orders can be entered in one of two ways:
You may enter common values for all items or specify these individually for each line.
Redant creates a job for each selected item.
Open the Job Orders module to view the new jobs.
Click New from the bottom menu.
You will be asked:
Create New Works Order?
Creates a new customer order.
Adds an additional item to the Works Order currently displayed.
A Works Order can contain multiple items.
Each item receives its own unique Job Number.
The Job Number is used during day-to-day processing, while the Works Order groups related jobs together for enquiry and progress-tracking purposes.
If creating a new Works Order:
Fields shown in blue are mandatory and must contain a value before the record can be saved.
The Job Quantity may be greater than the Order Quantity but cannot be less.
The following fields are required:
You must also verify:
These details are transferred to delivery notes and invoices.
Click Save to create the order.
Click Cancel if you do not wish to save it.
Once saved, the job receives an Entered status.
This indicates the order exists but is not yet ready for production.
Before a job can progress, Contract Review checks must be completed.
Typical checks may include:
If reviews are outstanding, the message:
Contract Review Not Complete
will appear in red.
To complete the review:
for each item.
Your User ID is recorded against each completed review item.
Some customers require an Order Acknowledgement before processing can continue.
This requirement is controlled within the Customer record.
To produce an acknowledgement:
Once completed, Customer Order No. will turn green.
Before activating a job, ensure the plans are complete.
The following plans may be required:
These plans determine:
Without these plans, information will not appear correctly on the Job / Route Card.
Activating a job applies the Process Plan times to the Production Scheduler.
This allows the Capacity Planning and Finite Scheduling modules to include the job in current workloads.
To activate:
The job status changes from:
Entered → Active
If plan changes are required later:
Alternatively, use Enquiry > Progress to modify active process plans.
Many companies leave Job Card printing until:
This ensures the Job Card contains the latest production information.
To print:
The job status changes to Printed only when sent to a physical printer.
A job progresses through several statuses:
| Status | Description |
|---|---|
| Entered | Order created but not yet activated |
| Active | Loaded into production planning |
| Printed | Job / Route Card printed |
| Live | Production has started |
| Manufactured | Production complete but not shipped |
| Complete | Fully delivered to customer |
| Hold | Processing suspended |
A job can be placed on Hold by editing the job and manually changing its status.
No further processing can take place while the job remains on Hold.