A work centre represents a resource used to complete an operation. This may be a machine, an inspection or assembly area, or an external process such as subcontract heat treatment.
Follow the steps below to create and configure a new work centre in RedAnt.
Navigate to:
Modules → Maintenance → Work Centres
Before creating a new record, use the Binoculars search function to check whether the work centre already exists. This helps prevent duplicate records.
Example:
| Field | Example Value |
|---|---|
| Code | MILL05 |
| Description | CNC Milling Machine 5 |
Note: This is only an example. Use a code and description that align with your organisation's standards.
Select the appropriate Group from the dropdown list.
Work centre groups are used to organise resources with similar capabilities, such as machines that can perform the same type of operation.
If a suitable group does not exist:
Important: Group work centres carefully, as grouping can influence resource selection during scheduling.
Review and enter any relevant:
These values can be automatically populated when the work centre is selected on an operation.
Note: Default values can be overridden within individual process records where operation-specific settings are required.
If your organisation uses RedAnt scheduling functionality, review and configure the following:
Set a realistic efficiency percentage that reflects the resource's actual capacity.
Example: If one operator manages multiple machines, each machine may operate below 100% efficiency.
Use Work Period Management to define the work centre's available operating hours.
Ensure that:
To make changes:
To confirm the work centre is available for operations:
Confirm the following:
Once these checks have been completed, the work centre is ready for use.