Creating and Managing Assemblies in RedAnt
Where a finished product consists of one or more sub-components or drawings, the Assembly feature in RedAnt can be used to structure and manage these relationships.
Assemblies are created and maintained within the Register Module, as outlined below.
1. Accessing the Register Module
From the Main Menu, select Register.
- This module contains the master list of all parts and drawings used in quotations and orders.
- The most recently created record will be displayed by default.
2. Creating Parts (Top-Level and Sub-Parts)
Click New from the bottom menu to create a new part.
Enter the following mandatory fields:
- Drawing Number
- Issue Number
- Description
- Stock ID
After entering the drawing and issue numbers, click into the Stock ID field.
- RedAnt will automatically generate a Stock ID based on the values entered.
Click Save.
- A prompt may appear requesting confirmation of the Stock Group and Type. Select OK, then click Save again.
(Optional) Enter a Customer ID to streamline future order entry.
Add process, material, and subcontract plans as required.
3. Defining the Top-Level Assembly Item
If the part represents the final product delivered to the customer:
- Click Edit.
- Tick the Assembly checkbox.
- Click Save.
✅ Important:
Only the top-level part should be marked as an assembly. Do not select this option for sub-components.
4. Creating Sub-Parts
- Repeat the steps in Section 2 to create all required sub-parts.
- Do not mark these items as assemblies.
5. Building the Assembly Structure
Locate the top-level part (use the Previous button if needed).
Click the Assembly icon next to the Assembly field.
- A message will appear indicating that no assembly structure exists.
- Click OK to create a new structure.
In the assembly window:
- The top-level item will appear at the top of the structure.
- Select it to highlight.
Click Add Component and:
- Enter the drawing number of a sub-part
- Specify the quantity required per top-level item
- Click Save
Repeat this process until all sub-parts have been added.
Close the assembly window when complete.
6. Creating a Job Order for an Assembly
Open the Job Orders module from the Main Menu.
Click New and confirm creation of a new order.
Enter all relevant order details, including:
- Customer information
- Quantity
- Order number
- Delivery date
Click Save.
7. Generating Jobs for Sub-Components
If the selected item is a top-level assembly:
- A prompt will appear asking whether to create jobs for sub-components.
- Leave the first option selected and untick any additional options if required.
- Click OK.
RedAnt will automatically generate jobs for all sub-components defined in the assembly structure.
8. Reviewing and Processing Jobs
Select the View Order tab to:
- Confirm all generated jobs
- Review the top-level and sub-component structure
Proceed with standard job processing:
- Complete contract review requirements
- Activate the job
- Print job cards
Related Articles
Drawing/Part Number Entry and Working with Plans
Overview This article explains the available methods for creating Drawing/Part Numbers in Redant and provides guidance on creating, managing and maintaining manufacturing plans. Understanding how plans work is essential for maintaining accurate ...
Working with Plans in RedAnt
Redant allows the same Drawing / Part Number to be manufactured using different methods through the use of Plans. There is currently no limit to the number of plans that can be created for a single drawing. When a new Drawing / Part Number is ...
Creating a New Drawing or Part Number
There are several ways to create a new Drawing Number or Part Number in RedAnt. Option 1: Use the Customer's Drawing / Part Number If the customer has supplied a Drawing or Part Number, use their reference exactly as provided, including any issue or ...
Setting Up Redant for Foreign Currency Transactions
This guide explains how to configure RedAnt to process foreign currency transactions and export the correct VAT codes to Sage or Xero. Sage / Xero Export VAT Code Setup From the Redant Main Menu, navigate to: Maintenance > Setup > Defaults Select VAT ...
Creating and Processing a Customer Order
Overview Customer orders can be entered into the system using one of two methods: Quotation Module – Convert an existing quotation into a customer order. Job Orders Module – Create a customer order manually. This article explains both methods and ...