Changing and Updating Work Centre Rates
From the Main Menu, navigate to Modules > Maintenance > Work Centres.
Locate the Work Centre you want to update and click Edit.
Update the required Rate field.
When you save the change, the system will display the following warning:
WARNING: These changes CANNOT be undone. Change Setup / Cycle Rate for ALL Process Plans?
Choose one of the following options:
- YES: Updates the rate for all processes associated with that Work Centre, including both current and historical process plans. This action cannot be undone.
- NO: The new rate will only be applied to newly created processes. Existing and historical process plans will remain unchanged.
Important
Updating a Work Centre rate can have a significant impact on costing and reporting data. If you select YES, the new rate will be applied to all associated process plans, both current and historical, and the change cannot be reversed. Ensure the new rate has been verified before proceeding.
Related Articles
Locking an Operation to a Work Centre
You can restrict an operation to a specific work centre by enabling the “Lock operation to work centre” option. This option can be found under the Quality tab of the operation within the Drawing Register module. To ensure this restriction is ...
Locking Process Plans
Overview The Lock Plan checkbox is used to prevent changes being made to a plan once it has been finalised or approved. In addition to restricting edits, it also prevents the scheduling system from moving processes to alternative work centres within ...
Setting Up Redant for Foreign Currency Transactions
This guide explains how to configure RedAnt to process foreign currency transactions and export the correct VAT codes to Sage or Xero. Sage / Xero Export VAT Code Setup From the Redant Main Menu, navigate to: Maintenance > Setup > Defaults Select VAT ...
Re-Quoting with a Revised Material Price
Overview When updating a quotation due to a change in material cost, users should be aware that updating the material price directly will overwrite the existing price. This can result in the loss of historical pricing information, making it difficult ...
Copying Live Data to the Play System
If you want to test changes or try out new processes in RedAnt without affecting your live data, you can create a copy of your live database in the Play System. This provides a snapshot of your live data that can be used safely for testing and ...